Warner Bros. Client Area
  • Home
  • Covid-19
  • Maps
  • WBSO Handbook
    1. OFFICE & PRODUCTION SERVICES (OPS)
    2. PURCHASING AND BILLING
    3. STUDIO PROTECTION GROUP/ EMERGENCY
    4. SAFETY & ENVIRONMENTAL AFFAIRS
    1. OFFICE & PRODUCTION SERVICES (OPS)
    • 1.0 - Overview
    • 1.1 - Sound Stage Chart
    • 1.2 - Stage Check-In and Check-Out:
    • 1.3 - General Stage Housekeeping
    • 1.4 - Hot Lock & Stage Card Access Procedures
    • 1.5 - Stage Specs
    • 1.6 - Overhead Loading – Roof Trusses & Permanent Beams
    • 1.7 - Permanent Construction Requests
    • 1.8 - Stage Lighting Guidelines​
    • 1.9 - Stage Dressing Rooms
    • 1.10 - Production Guidelines – Exterior Sets
    • 1.11 - Notification Policy For Surrounding Neighborhoods
    • 1.12 - Daily Call Sheets | Prod. Schedules | Staff & Crew
    • 1.13 - Radio Frequency Equipment – Prod. Sound & Video
    • 1.14 - Camera Policy & Press/Publicity Access Procedures
    • 1.15 - Production Guidelines - Water Sets
    • 1.16 - Office Guidelines
    • 1.17 - Furniture
    • 1.18 - Phones / Wi-Fi / StudioNet
    • 1.19 - Custodial Service
    • 1.20 - Signage/Exterior Display
    • 1.21 - Conference Room Bookings
    • 1.22 - Key Shop
    • 1.23 - Parking Services
    • 1.24 - Warner Bros. Labor Dept.
    • 1.25 - Recycling Guidelines / Social Vocational Services
    • 1.26 - Smoking Policy
    2. PURCHASING AND BILLING
    • 2.0 - Accounts Receivable Numbers (AR Number)
    • 2.1 - Studio Work Authorizations (Swa/Internal Po’s)
    • 2.2 - A Quick Reference Guide To SWA Creation
    • 2.3 - Studio Work Authorization Form
    • 2.4 - Construction Flat Bids
    • 2.5 - Invoices
    3. STUDIO PROTECTION GROUP/ EMERGENCY
    • 3.0 - Studio Protection Group (SPG)
    • 3.1 - WB Security - Primary Contacts​
    • 3.2 - Gate Hours
    • 3.3 - Studio Access Policies & Procedures
    • 3.4 - Access Categories & Pass Types
    • 3.5 - WBSO Call Sheet
    • 3.6 - WBSO Security – Traffic Department: Rules & Enforcement
    • 3.7- WBSO Security – Production Services
    • 3.8 - WBSO Security – Vendor Delivery Policies
    • 3.9 - Warner Bros. Entertainment Inc. Firearms-Weapons Policy
    • 3.10 - SPG: Warner Bros. First Aid Dept. - Information & Regulations
    • 3.11 - WBSO First Aid / Health & Wellness Services
    • 3.12 - SPG: Warner Bros. Fire Dept. - Information & Regulations
    • 3.13 - General Requirements
    • 3.14 - Evacuation Check List
    4. SAFETY & ENVIRONMENTAL AFFAIRS
    • 4.0 - Overview
    • 4.1 - Primary Contacts: On-lot Fire/Medical/Safety Emergency Line and S&EA Team
    • 4.2 - Injury, Illness Prevention Program (IIPP)
    • 4.3 - Important Points To Help Keep Your Employees Safe​
    • 4.4 - Staff & Crew Training​
    • 4.5 - Production Start-Up Guidelines For Warner Bros. Productions
    • 4.6 - Productions Not Affiliated with Warner Bros.
    • 4.7 - Inspection Procedures For OSHA And Other Regulatory Agencies
    • 4.8 - Craft Service: Food Preparation On Sets And Mobile Food Vehicles
    • 4.9 - Air Quality: Production Considerations
    • 4.11 - Managing Chemical-Containing Products
    • 4.12 - WBSO Sewer and Storm Drain Policies
    • 4.13 - Additional Storm Drain Policy Guidelines – By Department
    • 4.14 - Guidelines for Shipping Dangerous Goods
    • 4.15 - Unmanned Aerial Vehicles / Unmanned Aerial Camera Platforms / Drones
  • Forms
  • Directory
  • Safety On The Set
  • food.wb.com

Stage 24

WBSO - Stage 24

Download PDF

MEASUREMENTS

Stage Height

35'

Stage ft.

21,600 sq. ft.

Dimensions

160' x 135'

Buildable Area

12,145 sq. ft.

Elephant Door Size (West)

19’6”W x 23’6

Elephant Door Size (South)

14’6”W x 23’6”H

UTILITIES

Air Conditioning

Central

Heat

Yes

Power

4800 amps / 3 phase

Internet

Internet and Fiber available

SUPPORT SPACE

Int. Dressing Rooms w/ Restrooms

Yes

Gold Rooms

Yes

Sound Booth

Yes

Dimmer Room Upper Catwalks

Yes

WEIGHT RESTRICTIONS - STAGE FLOOR

MultiLayer Sub Floor w/ Cresform Surface

High density particle board atop (2) layers plywood atop raised compartment – rests atop 2x6 to 2x9” joists, supported by 6x6 to 8x8” wood girders, supported by 6x6 to 8x8” wood posts (6’ on center) on pressure-treated sleeper planks or concrete blocks.

Temporary Load Capacity

150 PSF

Max Gross Vehicle Weight

(GVW)
Buildable Floor Area - 10,000 lbs. (2,500 per wheel)

Interior Perimeter/Access Hatch

(GVW)
Max - 10,000 lbs. (2,500 per wheel)

Truck Loading Zone

(GVW)
Max - 14,000 lbs. (3,500 per wheel)

WEIGHT RESTRICTIONS - OVERHEAD LOADING

Load Limit Permanent Beams (perpendicular to truss)

6’x8’
500 lbs. single load / 300 lbs. for two loads

Load Limit "Green Sticks"

100 lbs.

Load only at nodes of roof truss or permanent beams.

DO NOT apply weight to center of truss or walkway planks.

Check connection of permanent beam to truss prior to load application.

  • Please contact OPS at 818-954-6777 and Safety & Environmental Affairs at 818-954-2890 to discuss any weight load questions.
  • Engineering approval required for any unusual load requirements on roof trusses or permanent beams.
  • Fall Protection is mandatory whenever working beyond the catwalk or guardrail in the “ozone”.
PrevPreviousStage 25
NextStage 23Next
  • Privacy Center
  • Privacy Policy
  • Terms of Use
  • WARNER BROS™ Warner Bros. Ent.